SERIES: Metering Room at Ground Level - Covered Open Space
NEW DWG NO. | OLD DWG NO. | TYPE-LAYOUT | CAPACITY IN NUMBER OF METERS | TOTAL LOAD CAPACITY | PROVISION FOR PHOTOVOLTAIC CELLS | MAIN USE |
7540018-1 | TQ/256-1 | EAC and Electrician's Areas Side by Side | <48 Equivelant 1-phase | > 300KVA | POSSIBLE | Block of Flats / Comm Development |
7540018-2 | TQ/256-2 | EAC and Electrician's Areas Side by Side | <48 Equivelant 1-phase | > 300KVA | POSSIBLE | Block of Flats / Comm Development |
7540018-3 | TQ/256-3 | EAC and Electrician's Areas Side by Side | >48 Equivelant 1-phase | > 300KVA | POSSIBLE | Block of Flats / Comm Development |
7540018-4 | TQ/256-4 | EAC and Electrician's Areas Side by Side | >48 Equivelant 1-phase | > 300KVA | POSSIBLE | Block of Flats / Comm Development |
7540018-5 | TQ/256-5 | EAC and Electrician's Areas Opposite each other | >48 Equivelant 1-phase | > 300KVA | POSSIBLE | Block of Flats / Comm Development |
7540018-6 | TQ/256-6 | EAC and Electrician's Areas Opposite each other | >48 Equivelant 1-phase | > 300KVA | POSSIBLE | Block of Flats / Comm Development |
7540018-7 | TQ/256-7 | EAC and Electrician's Areas Opposite each other | >48 Equivelant 1-phase | > 300KVA | POSSIBLE | Block of Flats / Comm Development |
7540018-8 | TQ/256-8 | Cabinet Type | <48 Equivelant 1-phase | > 300KVA | POSSIBLE | Block of Flats / Comm Development |
7540018-9 | TQ/256-9 | Cabinet Type | >48 Equivelant 1-phase | > 300KVA | POSSIBLE | Block of Flats / Comm Development |
7540018-10 | TQ/256-10 | Typical plan for load>300KVA | >48 Equivelant 1-phase | > 300KVA<600KVA | POSSIBLE | Block of Flats / Comm Development |
COMMENTS
- ONE THREE PHASE METER OCCUPIES TWO EQUIVELANT METER POSITIONS (SINGLE PHASE)
- ONE METERING PANEL (ELECTRIC LOAD>100A) OCCUPIES SPACE OF 80CM WIDTH AND 120CM HEIGHT
- ON THE METER BOARD A SPACE MUST BE PROVIDED FOR 2-3 EQUIVELANT METER POSITIONS FOR EAC (TARIFF RECEIVERS)
- FOR STORAGE RADIATORS A 3 PHASE METER IS REQUIRED (TWO EQUIVELANT SINGLE PHASE) + 1 POSITION FOR RECEIVER
- FOR ELECTRICAL LOADS > 300KVA MODIFICATIONS TO THE TYPICAL PLANS REQUIRED - COMMUNICATION WITH EAC