SERIES: Metering Room at Ground Level - Covered Open Space

 

NEW DWG NO.OLD DWG NO.TYPE-LAYOUTCAPACITY IN NUMBER OF METERSTOTAL LOAD CAPACITYPROVISION FOR PHOTOVOLTAIC CELLSMAIN USE
7540018-1TQ/256-1EAC and Electrician's Areas Side by Side<48 Equivelant 1-phase> 300KVAPOSSIBLEBlock of Flats / Comm Development
7540018-2TQ/256-2EAC and Electrician's Areas Side by Side<48 Equivelant 1-phase> 300KVAPOSSIBLEBlock of Flats / Comm Development
7540018-3TQ/256-3EAC and Electrician's Areas Side by Side>48 Equivelant 1-phase> 300KVAPOSSIBLEBlock of Flats / Comm Development
7540018-4TQ/256-4EAC and Electrician's Areas Side by Side>48 Equivelant 1-phase> 300KVAPOSSIBLEBlock of Flats / Comm Development
7540018-5TQ/256-5EAC and Electrician's Areas Opposite each other>48 Equivelant 1-phase> 300KVAPOSSIBLEBlock of Flats / Comm Development
7540018-6TQ/256-6EAC and Electrician's Areas Opposite each other>48 Equivelant 1-phase> 300KVAPOSSIBLEBlock of Flats / Comm Development
7540018-7TQ/256-7EAC and Electrician's Areas Opposite each other>48 Equivelant 1-phase> 300KVAPOSSIBLEBlock of Flats / Comm Development
7540018-8TQ/256-8Cabinet Type<48 Equivelant 1-phase> 300KVAPOSSIBLEBlock of Flats / Comm Development
7540018-9TQ/256-9Cabinet Type>48 Equivelant 1-phase> 300KVAPOSSIBLEBlock of Flats / Comm Development
7540018-10TQ/256-10Typical plan for load>300KVA>48 Equivelant 1-phase> 300KVA<600KVA POSSIBLEBlock of Flats / Comm Development

COMMENTS

  • ONE THREE PHASE METER OCCUPIES TWO EQUIVELANT METER POSITIONS (SINGLE PHASE)
  • ONE METERING PANEL (ELECTRIC LOAD>100A) OCCUPIES SPACE OF 80CM WIDTH AND 120CM HEIGHT
  • ON THE METER BOARD A SPACE MUST BE PROVIDED FOR 2-3 EQUIVELANT METER POSITIONS FOR EAC (TARIFF RECEIVERS)
  • FOR STORAGE RADIATORS A 3 PHASE METER IS REQUIRED (TWO EQUIVELANT SINGLE PHASE) + 1 POSITION FOR RECEIVER
  • FOR ELECTRICAL LOADS > 300KVA MODIFICATIONS TO THE TYPICAL PLANS REQUIRED - COMMUNICATION WITH EAC
​​​​