New electricity supply hours for thermal accumulators

New electricity supply hours for thermal accumulators 

Thermal Energy Storage 

The Distribution System Operator is continuously making every effort to upgrade its services, best serve the Network Users as well as to optimize the operation of its System with the main objective of saving energy and making more efficient use of its existing equipment and facilities.

After studying the fluctuation of electricity demand, it was decided to differentiate the hours of electricity supply to the thermal accumulators during the period November 16th, 2023 – January 15th, 2024 operating on the basis of thermal energy storage pricing. It should be noted that, during the above period, some improvements may be made to the thermal accumulator supply program.

Care has been taken in the design of the study for both 10-hour thermal accumulators and 7-hour thermal accumulators.

Supply hours for the load group I (A02-13, Potteries / Bakeries) will remain those that apply today, throughout the year.

 

DELIVERY HOURS ​ ​ ​ ​​



Supply Period


Day TimeNight time

Supply

Between

Hours


Supply Duration

Supply

Between

Hours


Supply Duration

 

November 16th , 2023 –

January 15th, 2024

 

10:50 - 16:35



Approximately 1 hour and  25 minutes

 

20:30 - 8:00

 

Approximately 8 hours

 