CABINET FOR METERING PANEL

​SERIES: CABINET FOR METERING PANEL

NEW DWG. NO.

OLD DWG. NO.

TYPE-LAYOUT

CAPACITY IN NUMBER OF METERS

TOTAL LOAD CAPACITY

PROVISION FOR PHOTOVOLTAIC CELLS

MAIN USE

7540017-1

TQ/255-1

Supply from front

1 Metering panel

< 300KVA

NO

Industrial /Commercial Developments

7540017-2

TQ/255-2

Supply from right

1 Metering panel

< 300KVA

NO

Industrial /Commercial Developments

7540017-3

TQ/255-3

Supply from left

1 Metering panel

< 300KVA

NO

Industrial /Commercial Developments

7540017-4

TQ/255-4

Supply from rear

1 Metering panel

< 300KVA

NO

Industrial /Commercial Developments

7540017-5

TQ/255-5

Supply from front

1 Metering panel+1-3 phase

< 300KVA

POSSIBLE

Industrial /Commercial Developments

7540017-6

TQ/255-6

Supply from right

1 Metering panel+1-3 phase

< 300KVA

POSSIBLE

Industrial /Commercial Developments

7540017-7

TQ/255-7

Supply from left

1 Metering panel+1-3 phase

< 300KVA

POSSIBLE

Industrial /Commercial Developments

7540017-8

TQ/255-8

Supply from rear

1 Metering panel+1-3 phase

< 300KVA

POSSIBLE

Industrial /Commercial Developments

7540017-9

TQ/255-9

Supply from front

1 Metering panel+6-1 phase

< 300KVA

POSSIBLE

Industrial /Commercial Developments

7540017-10

TQ/255-10

Supply from right

1 Metering panel+6-1 phase

< 300KVA

POSSIBLE

Industrial /Commercial Developments

7540017-11

TQ/255-11

Supply from left

1 Metering panel+6-1 phase

< 300KVA

POSSIBLE

Industrial /Commercial Developments

7540017-12

TQ/255-12

Supply from rear

1 Metering panel+6-1 phase

< 300KVA

POSSIBLE

Industrial /Commercial Developments

7540017-13

TQ/255-13

Typical plan for loads>300KVA

1 Metering panel

> 3000KVA<600KVA

NO

Industrial /Commercial Developments

 

COMMENTS

  • ONE THREE PHASE METER OCCUPIES TWO EQUIVELANT METER POSITIONS (SINGLE PHASE)
  • ONE METERING PANEL (ELECTRIC LOAD>100A) OCCUPIES SPACE OF 80CM WIDTH AND 120CM HEIGHT
  • ON THE METER BOARD A SPACE MUST BE PROVIDED FOR 2-3 EQUIVELANT METER POSITIONS FOR EAC (TARIFF RECEIVERS)
  • FOR STORAGE RADIATORS A 3 PHASE METER IS REQUIRED (TWO EQUIVELANT SINGLE PHASE) + 1 POSITION FOR RECEIVER
  • FOR ELECTRICAL LOADS > 300KVA MODIFICATIONS TO THE TYPICAL PLANS REQUIRED - COMMUNICATION WITH EAC

 


​​​​​​