SERIES: Cabinet with opening meter board
NEW DWG. NO |
OLD DWG. NO |
TYPE - LAYOUT |
CAPACITY IN NUMBER OF METERS |
TOTAL LOAD CAPACITY CELLS |
PROVISION FOR PHOTOVOLTAIC |
MAIN USE |
7540016-1 | TQ/254-1 | Supply from front | 16 Equivalent Single phase | < 300KVA | POSSIBLE | Block of flats/light industrial/warehouses |
7540016-2 | TQ/254-2 | Supply from right | 16 Equivalent Single phase | < 300KVA | POSSIBLE | Block of flats/light industrial/warehouses |
7540016-3 | TQ/254-3 | Supply from left | 16 Equivalent Single phase | < 300KVA | POSSIBLE | Block of flats/light industrial/warehouses |
7540016-4 | TQ/254-4 | Supply from rear | 16 Equivalent Single phase | < 300KVA | POSSIBLE | Block of flats/light industrial/warehouses |
7540016-5 | TQ/254-5 | In basement-Supply from side | 16 Equivalent Single phase | < 300KVA | POSSIBLE | Block of flats/light industrial/warehouses |
7540016-6 | TQ/254-6 | In basement-Supply from rear | 16 Equivalent Single phase | < 300KVA | POSSIBLE | Block of flats/light industrial/warehouses |
7540016-7 | TQ/260 | Iron structure frame for meter board | | | | |
COMMENTS
- ONE THREE PHASE METER OCCUPIES TWO EQUIVELANT METER POSITIONS (SINGLE PHASE)
- ONE METERING PANEL (ELECTRIC LOAD>100A) OCCUPIES SPACE OF 80CM WIDTH AND 120CM HEIGHT
- ON THE METER BOARD A SPACE MUST BE PROVIDED FOR 2-3 EQUIVELANT METER POSITIONS FOR EAC (TARIFF RECEIVERS)
- FOR STORAGE RADIATORS A 3 PHASE METER IS REQUIRED (TWO EQUIVELANT SINGLE PHASE) + 1 POSITION FOR RECEIVER
- FOR ELECTRICAL LOADS > 300KVA MODIFICATIONS TO THE TYPICAL PLANS REQUIRED -
COMMUNICATION WITH EAC