SERIES: Cabinet with opening meter board

 

NEW DWG. NO

OLD DWG. NO

TYPE - LAYOUT

CAPACITY IN NUMBER OF METERS

TOTAL LOAD CAPACITY CELLS

PROVISION FOR PHOTOVOLTAIC

MAIN USE

7540016-1

TQ/254-1

Supply from front

16 Equivalent Single

phase

< 300KVA

POSSIBLE

Block of flats/light industrial/warehouses

7540016-2

TQ/254-2

Supply from right

16 Equivalent Single phase

< 300KVA

POSSIBLE

Block of flats/light industrial/warehouses

7540016-3

TQ/254-3

Supply from left

16 Equivalent Single

phase

< 300KVA

POSSIBLE

Block of flats/light industrial/warehouses

7540016-4

TQ/254-4

Supply from rear

16 Equivalent Single

phase

< 300KVA

POSSIBLE

Block of flats/light industrial/warehouses

7540016-5

TQ/254-5

In basement-Supply from side

16 Equivalent Single

phase

< 300KVA

POSSIBLE

Block of flats/light industrial/warehouses

7540016-6

TQ/254-6

In basement-Supply from rear

16 Equivalent Single

phase

< 300KVA

POSSIBLE

Block of flats/light industrial/warehouses

7540016-7

TQ/260

Iron structure frame for meter board

 

COMMENTS

  •  ONE THREE PHASE METER OCCUPIES TWO EQUIVELANT METER POSITIONS (SINGLE PHASE)
  •  ONE METERING PANEL (ELECTRIC LOAD>100A) OCCUPIES SPACE OF 80CM WIDTH AND 120CM HEIGHT
  •  ON THE METER BOARD A SPACE MUST BE PROVIDED FOR 2-3 EQUIVELANT METER POSITIONS FOR EAC (TARIFF RECEIVERS)
  •  FOR STORAGE RADIATORS A 3 PHASE METER IS REQUIRED (TWO EQUIVELANT SINGLE PHASE) + 1 POSITION FOR RECEIVER
  •  FOR ELECTRICAL LOADS > 300KVA MODIFICATIONS TO THE TYPICAL PLANS REQUIRED - COMMUNICATION WITH EAC
​​​