PV system owners with installed PV capacities in the range 0 – 499kWp in various areas around Cyprus, are hereby informed that a series of performance tests will be carried out on the PV tele-control platform known as “Ripple control" on 31/10/2024 between 11.30 – 12.30.
As a result of these tests affected PV systems will be disconnected for a few minutes.