Mass Installation of Smart Meters - April 2025

 The Electricity Authority of Cyprus announces that during April the mass installation of smart meters will continue in all EAC Regions in the following areas:

 

Nicosia:          Strovolos

                         Area between Stavrou and Spyros Kyprianou Avenue and on either side of Tseriou Avenue near Theoktisto Roundabout

                         French Ambassador area.

 

                         Aglantzia

                         On either side of Larnaca Avenue, from Panepistimiou roundabout to the height of the Satirical Theatre

 

Limassol:       Mesa Geitonia and Agios Athanasios

                         Area between Limassol-Nicosia Road and Archbishop Makarios III Avenue.

                         On either side of Limassol-Nicosia Road at the height of Tsiriou Stadium

 

Larnaka:        Larnaka

                        Kamares and Agios Georgios Makris Areas, on either side of K-Cineplex roundabout East of Antonis Papadopoulos Stadium, between Spyros                              Kyprianou and Grigoris Afxentiou Avenues

 

Paralimni:      1st April Avenue - Kokkinos Supermarket Area

Protaras :       Pernera Area and Hotel Avenue North of Metro Supermarket and up to George Papadopoulou Street

                         North of Paralimni Old Stadium

 

Paphos:         Pafiako Stadium Area Between Athens, Grivas Digeni, Apostolos Pavlou, Spyros Kyprianou and Europe Avenues

                        North of the Ring Road Intersection to Limassol between Dimokratias Avenue and Mesogi and Vasilika Streets

 

We remind you that in order to safely replace the meter, the supply will be interrupted for a period of time that is not expected to exceed 20 minutes. The Authority apologizes for any inconvenience.

-End-